What issue is the trial examining?
The size of farming properties often requires multiple connections to the electricity network to supply power to different locations around the same property. Each of those connections is billed separately for its use of electricity, including its use of the network to deliver that electricity.
For primary producers who also generate their own electricity, the use of billing arrangements that mirror the physical separation of the individual connection points on their farm prevents electricity generated at one location on the farm from being used to reduce the power bills for other connections on the same property.
The trial is testing billing arrangements that enable the generation and consumption of electricity at multiple connection points on the same property at the same time to be aggregated for the purposes of calculating network and retail charges for that customer.
Why is TasNetworks conducting a trial?
A number of primary producers and their advocates have called for farmers with on-farm generation to be able to use the shared electricity network to deliver the energy they produce to other connections on the same property, rather than having to export any excess energy they produce to be used by other customers, while at the same time buying back energy from an electricity retailer.
The billing systems needed to combine the consumption and generation of electricity across multiple connections on the same property represent a significant change for TasNetworks. In fact, TasNetworks' existing systems cannot group multiple connections in order to apply charges at a property or customer level.
The tariffs envisaged by the customers asking for aggregated electricity metering would require system upgrades and extensive modification, but the concept can at least be tested through a trial. To do so, however, TasNetworks has had to design and price a new network tariff, develop the means by which the metering data for multiple connections can be aggregated and a system for applying charges to the total.
What is the purpose of the trial?
The trial is testing a new type of network tariff and billing arrangements, which recognise the generation and use of electricity at multiple connections/metering points on the same property. This will enable primary producers who have invested in their own electricity generation to maximise the benefits from that investment by notionally using the electricity they generate to power multiple loads around their property, rather than exporting any energy they can’t use at the point of generation for use by other customers.
How will primary producers potentially benefit from the trial?
The purpose of the trial is to develop and test network charges and billing systems that could lead to the introduction of new network tariffs on a permanent basis. The ability to aggregate metering data from multiple connections on the same property for the purposes of calculating network charges (and potentially retail charges) could offer primary producers a number of benefits, including:
- electricity generated at one location on a primary production property can notionally be used at other connection points on the same property;
- the aggregated generation and consumption of electricity at multiple connections on the one property can be taken into account when calculating network charges; and
- primary producers with their own electricity generation and multiple connections to the network will have greater control over their electricity costs and derive greater value from their investment in on-farm generation.
When is the trial being conducted?
The trial commenced on 1 July 2025 and will run for 12 months, to enable TasNetworks to collect data and insights from participating customers that take into account seasonal variations in electricity usage and consumption.
Who can participate in the trial?
The trial is aimed at primary producers with:
- on-farm electricity generation;
- multiple connections with the electricity network on the same property;
- advanced (‘smart’) meters at each connection point; and
- each connection point served by the same electricity retailer (Aurora Energy).
Does it cost anything to participate in the trial?
Apart from an investment of some time before, during and after the conclusion of the trial, there are no costs to the businesses that participate in the trial.
Plus, because the network billing arrangements being tested will be reflected in participating customers’ electricity bills (via an adjustment to the bill for a single connection on a participant’s property), participants could reduce their overall electricity costs during the trial if they produce more electricity than they use at the connection on their property where the power is generated, and use that energy at another connection on the same property.
How can I participate in the trial?
There are nine primary producers participating in the trial and expressions of interest in the trial have closed.
What happens when the trial ends?
At the conclusion of the testing phase of the trial, TasNetworks and Aurora Energy will resume applying the tariffs and billing arrangements that were applied to the various connections on a primary producers property before the trial and billing each connection separately.
In staging the trial, TasNetworks makes gives no undertaking that it will introduce new network tariffs in the future that are the same as, or similar to, the network tariffs tested during the trial, or that any future network tariffs introduced by TasNetworks will be made available on the same terms or at the same prices as the network billing arrangements that were the subject of the trial.
If I need to, can I end the trial early?
A 12-month testing phase is considered sufficiently long to properly test the objectives of the Trial, and to account for seasonal variations in participants’ energy use and generation. Anything less is unlikely to yield meaningful results for individual participants or for the Trial.
By agreeing to participate in the Trial, participants have agreed to the application of the Trial Tariff for the full term of the Trial. However, we understand that personal and business circumstances can change, and TasNetworks will put a process in place to cater for Trial participants that need to withdraw from the Trial before its conclusion. This will be considered on a case-by-case basis.