Service and Installation Rules (SIR) v8.1 : Change Fact Sheet

TasNetworks SIR version 8.1 comes into effect 1 July, 2022.


We have created the SIR v8.1 : Change Fact Sheet to remind you of some of the changes from the previous version of the SIR.

It is important to remember that this change fact sheet does not replace the SIR and it is the responsibility of the Electrical Contractor to ensure work completed meets all applicable rules, standards and legislative requirements.

Failure to meet these requirements will delay the connection process.


The SIR is authorised when accessed via TasNetworks Website (External link). All copies of this document, including print and electronic, are uncontrolled. Reference to SIR version 7 will be removed from the TasNetworks website from 30th June, 2022.

Categories: #SIR #SIRv8.1 #Service&InstallationRules
Share on Facebook Share on Twitter Share on Linkedin Email this link
<span class="translation_missing" title="translation missing: en.projects.blog_posts.show.load_comment_text">Load Comment Text</span>